Well the next piece in the fireplace package was to get our last 2 inspections and get all our tags.
D called for the inspection and then did something really smart.
She gathered all the pics from the build and put them in a gallery on her IPAD. From the initial install, to tearing the wall apart, the gas line instal, electrical, insulation, drywall, and finally the hole in the wall with the vent and seal and all that.
The guy was impressed with our work, and really liked the Tiger foam spray in insulation.
in the end, we are all signed off and that permit with the city is closed!
DD
No comments:
Post a Comment